Media

Recent Projects

July 2022 – August 2022 – Progress on 60×30 Bolt-Up Building – 40×30 enclosed with a 20×30 porch. Polar white side walls with charcoal grey trim

July 2022 – 12′ x 24′ Loafing Shed. Charcoal Sidewalls, Galvalume Roof and Burgundy Trim

June 2022 – 4.5” x 2 7/8” 4 rail entrance with solar power 16’ gate and keypad entry

May 2022 – 5 rail entrance with kick outs for landscaping with 14’ gate.

April 2022 – Stay Tuff 1348-4-330 fence with 2 strand slick wires ran on top. Cedar bull staves every 2’. One 12ft gate and two 10ft gates.

March 26, 2022 – 12′ x 6′ cattle guard with 24″ x 20″ curb and gutter base with double 6′ gates.

February 18, 2022 – Simple top rail entrance with 5 strand wire and 14′ gate.

January 10, 2022 – The 50′ x 60′ shop got the final touches added to it. The charcoal grey and polar white trim and gutter really make this beast stand out!

January 5-6, 2022 – Finishing up by trimming the top out, adding gutter and installing the man-door.

January 3-4, 2022 – Kicking off the New Year with some side sheets and trim

December 31, 2021 – Ending the last day of the year by finishing up the 50′ x 60′ framework. Next step is sheeting the entire thing.

December 30, 2021 – Snapshot at sunset after a day adding in purlin and I-beam on the 50′ x 60′ shop.

December 29, 2021 – We are working on a 50′ x 60′ shop in Lingleville, Texas. Here are a few progress pictures from the project of the columns going up.


Social Media

Follow us on Facebook by clicking the blue icon above, it’ll help you stay up to date on fence specials and current projects.

Create your website with WordPress.com
Get started